Hornersville, Missouri · $5,689,485.00 Contract · Completed Jun 11, 2015 · RKE as Prime Contractor | Self-Performed 100% of Construction Operations
Project Overview

Scope and Delivery

The project involved the simultaneous execution of two remote jobsite locations within the Little River Floodway, requiring specialized equipment, extensive logistical planning, and continuous monitoring of changing site conditions. Limited site access, weight-restricted bridge crossings, soft ground conditions, and fluctuating water levels presented significant construction challenges throughout the project.

Scope of work: excavation of approximately 32 miles (1,694 stations) of drainage ditches totaling 1,148,000 cubic yards; construction of 17 miles of levees; placement of 571,000 cubic yards of top bank shaping; installation of 9,000 tons of R200 riprap above and below water level; breach repairs; clearing and snagging operations; seeding and mulching; environmental protection measures; specified demolition, including abandoned bridge pier removal and pipe trimming; and filter fabric installation. To support construction operations, RKE coordinated specialized material handling logistics, constructed and maintained haul roads, and utilized long-reach excavators, amphibious excavators, draglines, dozers, articulated haul trucks, and other heavy equipment. RKE served as the prime contractor and self-performed 100% of the work, successfully delivering critical levee and drainage improvements while maintaining safe operations within an active floodway environment.