Grand Prairie Inlet Channel
Scope & Delivery
The project involved providing the labor, equipment, materials, and construction expertise necessary to construct approximately 1,500 linear feet of inlet channel connecting the Grand Prairie Pump Station to the White River. The work required careful planning and execution of large-scale excavation activities to establish a reliable hydraulic connection while maintaining project schedule and quality requirements.
Scope of work: channel excavation; excavated material embankment (EME) placement; riprap and filter material installation; grading and shaping of channel features; and hauling and placement of earthwork materials. RKE served as the prime contractor and self-performed the major construction operations utilizing a Manitowoc 4600 dragline, long-reach excavators, standard excavators, and haul trucks. The completed inlet channel provides critical water conveyance infrastructure supporting the operation of the Grand Prairie Pump Station and regional water resources management system.