Grande Prairie Pump Station
Scope and Delivery
The project involved completing the pump station substructure to Elevation 190.0 after construction had been suspended for six years and the partially completed structure remained submerged following contract termination of the previous contractor. Upon award, RKE undertook extensive site investigation, unwatering, and remediation efforts to evaluate existing conditions and resume construction while coordinating numerous contract modifications with the owner to address unforeseen conditions and previously completed work.
Scope of work: development and operation of a 19-well deep-well dewatering system; site unwatering and inspection; correction of deficiencies from prior construction activities; 253,000 cubic yards of excavation, structural backfill, and embankment placement; cofferdam construction; environmental protection measures; surveying and staking; stone protection; repair and completion of underground drainage systems; construction of a 40-foot-tall mechanically stabilized earth (MSE) wall; installation of embedded drains, valves, piping, conduit, access hatches, anchor bolts, frames, personnel doors, handrails, and ladders; final grading and seeding; and installation of approximately 5,600 linear feet of chain-link security fencing. RKE served as the prime contractor and successfully managed complex site conditions, maintaining continuous dewatering operations for two years, including throughout the historic 2011 flood event.