St. Louis Jefferson Barracks VAMC Completion Project
Scope and Delivery
The project involved the modernization and improvement of infrastructure across the east and west campuses of an active VA medical center. Work encompassed 34 individual projects spanning civil, mechanical, electrical, architectural, and site disciplines, requiring extensive coordination to maintain uninterrupted healthcare operations and minimize impacts to patients, staff, and visitors.
Scope of work: upgrades to high-pressure steam and chilled water systems; welded and x-ray tested piping connections; improvements to domestic water, fire protection, and stormwater drainage systems; roadway repairs and construction; ADA-compliant sidewalks and parking improvements; exterior lighting upgrades; site restoration activities; replacement and upsizing of water lines; irrigation system repairs; installation of traffic detector loops; removal of abandoned utilities and hazardous trees; and renovation of the Rehabilitation Building pool area. Pool renovations included controlled demolition, temporary HVAC systems, and negative air containment measures to protect adjacent occupied spaces. RKE served as the prime contractor, carefully phasing construction activities, coordinating closely with VA personnel, and implementing utility outage plans and traffic control measures to successfully deliver complex improvements within a fully operational medical campus.