This USACE project consisted of constructing approximately 1500 linear feet of Inlet channel that connects the Grand Prairie Pumping Station to the White River. Randy Kinder Excavating (RKE) utilized a Manitowoc 4600 dragline in combination with both long reach and standard excavators plus haul trucks to perform all operations necessary for the construction of the new pumping station inlet channel. The work included excavated material embankment (EME) placement, as well as riprap and filter material placement.