SBA Small Business · HUBZone · SDVOSB Certified
573-624-5277 Employee Portal ↗
RKE Contractors Request a Bid Package
RKE Contractors
About Capabilities Projects News Careers Contact Employee Portal ↗
Request a Bid Package → CALL 573-624-5277
Our Projects
Home / Projects

Our Projects

Four decades of federal and civil work — filter by the type of work, not the paperwork.

A Portfolio Built on Performance

Building the Foundations of America: Rigid Infrastructure Proven on Site

The infrastructure we build does more than serve today's needs—it strengthens our nation for generations to come. At RKE, we're proud to build projects that protect communities, strengthen our economy, and fuel national growth. Every bridge, levee, road, floodwall, and cemetery is a commitment to quality, durability, and the future generations that will depend on it.

Browse our work by capability or customer below.

6 PROJECTS
Cache River Culvert Repairs Levee, Flood Control & Water Resources
Cache River Culvert Repairs
U.S. Army Corps of Engineers
Memphis District · $1,295,443 · Completed 2024
Ditch 251 Channel Cleanout Levee, Flood Control & Water Resources
Ditch 251 Channel Cleanout
U.S. Army Corps of Engineers
Pemiscot & New Madrid County, Missouri · $9,100,179 · Completed 2023
Belle Fountain Ditches Cleanout Levee, Flood Control & Water Resources
Belle Fountain Ditches Cleanout
U.S. Army Corps of Engineers
Caruthersville, Missouri · $2,740,918
Cape Girardeau Floodwall Toe Drain Replacement Levee, Flood Control & Water Resources
Cape Girardeau Floodwall Toe Drain Replacement
U.S. Army Corps of Engineers
Cape Girardeau, Missouri · $1,440,501 · Completed 2016
W.D. Mayo Lock & Dam 14 – Embankment & Cherokee Chute Repair Levee, Flood Control & Water Resources
W.D. Mayo Lock & Dam 14 – Embankment & Cherokee Chute Repair
U.S. Army Corps of Engineers
Le Flore County, Oklahoma · $4,637,335 · Completed 2025
Clarence Cannon Dam Flood Repair Levee, Flood Control & Water Resources
Clarence Cannon Dam Flood Repair
U.S. Army Corps of Engineers
Monroe City, Missouri · $6,265,620 · Completed 2011
Performance Feedback

What Our Customers Are Saying

WD Mayo Lock & Dam

The Contractor understands the impact this work has on water management while reshaping and armoring of the crest and land side of the embankment. The Contractor has utilized working longer days to get ahead of schedule and reduce the risk of high-water flows occurring. Example: The contractor was shut down for approx. four months due to high river flows and was still able to finish required contract completion date without any contract extension.
Area Engineer, USACE U.S. Army Corps of Engineers

Fort Gibson National Cemetery Construct Columbarium

Thanks again for you and your teams’ work on this final phase of the project and we look forward to working together on future construction projects. NCA is grateful for RKE’s attention to detail, and quality of work on our National Shrine and honoring our Veterans.
Contract Specialist, Dept. of Veterans Affairs - National Cemetery Administration Department of Veterans Affairs
Read All Reviews →

Start Your Project With RKE